Deutz 1012 Dokumentacja Strona 168

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 282
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 167
Page 10
Section 4.5
Service Training
4.5.5 BRAKE SHAFT STOP SCREWS
- Connect a low pressure gauge to port BR on the travel control unit.
- Slacken the clamping screw on the brake lever and turn the brake shaft (5) clockwise as far as the stop.
- Loosen locknut (2).
- Start engine. Slowly screw in setscrew (1) while at the same time holding brake shaft (5) clockwise against
the stop until the brake shaft has less clearance.
- Now gently screw out setscrew (1) while holding the brakeshaft clockwise against the stop until the
maximum pressure is obtained. Then screw out setscrew a further ¼ turn and tighten locknut (2).
- Adjust the brake pedal as described in "Brake pedal".
09.96
Przeglądanie stron 167
1 2 ... 163 164 165 166 167 168 169 170 171 172 173 ... 281 282

Komentarze do niniejszej Instrukcji

Brak uwag