Deutz 1012 Dokumentacja Strona 264

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 282
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 263
Service Training
Section 4.9
Page 38
12.05
MAINTENANCE ON VAPORISOR
Maintenance on the vaporisor should include the checking of the secondary valve actuating lever (1).
The Impco maintenance kits are used for two different vaporisor types (series E and EP). As a result, a
check must be carried out, and, if necessary, the actuating lever (1) has to be bent accordingly.
To carry out the check and the bending adjustment, proceed as follows:
After assembly of the maintenance kit, check the position of the connecting pin (4) using a setting bar (3)
and a feeler gauge. A setting bar is placed over the housing (5). The spring (2) pushes the valve into its
closed position. The distance between the connecting pin (4) and the setting bar (3) must be 1 mm. If
necessary, the actuating lever (1) should be bent to achieve this dimension.
1 Actuating lever
2 Spring
3 Setting bar
4 Secondary diaphragm connecting pin
5 Vaporizor housing
Przeglądanie stron 263
1 2 ... 259 260 261 262 263 264 265 266 267 268 269 ... 281 282

Komentarze do niniejszej Instrukcji

Brak uwag